System objectives from this module:

Production Planning is the heart of the ERP’s manufacturing planning and control system. The core output from the module is the generation of an optimized production plan, which results due to a multitude of complex calculations performed by the Material Requirement Planning II (MRP II) engine. The MRP engine takes the product structure of the package, order quantity, delivery date, process and procurement lead times to generate the production plan. This plan automatically calculates when which process should start and end, what materials and quantities would be required before a particular manufacturing process. The planning keeps getting updated due to a number of real-life events, such as job confirmations, delays in material arrival, machine breakdown, urgent orders etc.

The plans generated by the MRP II based ERP also takes into consideration the installed machine capacity department-wise, existing planned loads and effect on capacities across work centers upon planning a certain order within ERP determined time period. This process, called Capacity Requirement Planning (CRP), is an integral part of the PP module.

In case of projected overloads, decisions are taken by the production planner to either shift the order forward, split order or enhance capacity by engaging extra shits or personnel, subcontracting or by installing more machines in-house.The PP module also generates standard costing for the entire order.

:: The following are some of the outputs from the PP module:
Generation of production plan, validated against current capacity and available time.
Requirement determination for procurement w.r.t. the net quantities of raw materials to be purchased, order-wise and order group-wise
Job dispatches for the work centers in production containing, for every work center, the specifications of the processing, start / end dates and time, job priority, current status of job etc.
Exception messages to planners, management, department incharges etc
regarding change in production plans or when upon an event occurring against the production plan.

Early warning messages to ERP users, such as credit payments worth Rs. 620000 maturing in next 5 days, delivery of Dye Azumuthal Blue expected tomorrow against PO # 513 etc.
Information for costing module regarding standard production costs for a planned
order.
 
ERP Functional areas:
Production Planning
Master setups
Product structure creation
Machine-wise capacity setups
Production lead-time setups
Planning hierarchy setups
Planning unit and duration
Generating production plan
Capacity Requirement Planning
Plan validation and dispatch creation
Plan adjustments & Production re-planning
Reports & Exception messages
:: Development Tools used
Microsoft Visual Basic 6
Microsoft Access / MS Sql Server 2000
Seagate Crystal Reports (For reporting)

 

:: CUSTOM SERVICES
  CLIENT-SERVER APPLICATIONS
DISTRIBUTED APPLICATIONS
COMPONENT DEVELOPMENT
XML APPLICATIONS
WEBSITE DESIGN
LOGO DESIGN
FLASH DEVELOPMENT
DATABASE DRIVEN SITES
SEARCH ENGINE OPTIMIZATION
:: TESTIMIONIALS
Umar is extremely creative and very patient when it comes to scope-creep! This web site started out as an idea and Umar was able to create an excellent base from which we both could build on together. As he designed, I thought of new ideas, he implemented and we worked very well together.
Thanks -djt
Very enthusiastic and responsive. Responded to all change and modification requests promptly. Have done an excellent job and I would like to work with them in the future too. Am sure this young team will do very well if they work in the same spirit with which they did this job. My best wishes to them.
Rajesh
.::Online Support::.
Need to get a quote urgently? Open a support ticket with our sales department.
 
Creative Solutions ® | All rights reserved @ 2009